Wednesday, May 14, 2008

Burj Dubai May 13th 2008 photo update

Burj Dubai May 13th 2008 photo update, here is two very nice aerial photos of the Burj Dubai and the surrounding city of Dubai.


Tuesday, May 13, 2008

Burj Dubai sets new global record in glass panel installation

Dubai, UAE; May 12, 2008: Setting new global records in practical engineering and architecture, Burj Dubai, the iconic tower developed by Emaar Properties, has recorded another global first with the installation of glass panels at a height of 512 metres (1,679.76 ft). Arabian Aluminium Company set the new record today (May 12, 2008) by laying out the high-performance cladding system on Level 141. The cladding system uses reflective glazing, aluminum & textured steel spandrels and vertical stainless steel tubular fins as the primary materials.

Mr Ahmad Al Matrooshi, UAE Managing Director, Emaar Properties, said: “Burj Dubai is setting a new world record in all aspects of high-rise construction. With cladding undertaken on Level 141 of the tower, we have pushed the frontiers of engineering high-rises one-notch higher. Every aspect of the tower now serves as a referral source on the practicalities of developing skyscrapers.” Mr Bashar Kayali, General Manager, Arabian Aluminium Company - a member of Al Ghurair Construction Industries LLC, said: “Cladding work of Burj Dubai is being undertaken on a fast-track basis. Installing glass panel at high altitudes is a very challenging task that demands the integration of several work-flow systems. With the completion of glass panel installation on Level 141, we are now entering a new realm in executing cladding works.”

At 636 metres (2,063.6 ft) and more than 160 storeys high, Burj Dubai is now the world’s tallest building and tallest man-made structure having recently surpassed the height of the KVLY-TV mast in North Dakota, USA - 628.8 metres (2,063 ft). Burj Dubai is taller than Taipei 101 (508 metres; 1667 ft) in Taiwan and CN Tower (553.33 metres; 1815.5 ft) in Toronto, Canada. When completed, Burj Dubai will meet all four criteria listed by the Council on Tall Buildings and Urban Habitat (CTBUH), which classifies the world’s tallest structures. CTBUH measures the height of buildings to the structural top, the highest occupied floor, the top of the roof and the tip of the spire, pinnacle, antenna, mast or flag pole.

Burj Dubai anchors Downtown Burj Dubai, an AED 73 billion (US$20 billion) mixed-use mega project, already a bustling community described as the new ‘heart of the city.’ The tower features residences, commercial space and retail space and hospitality elements including the world’s first Armani Hotel and Armani Residences.

Monday, May 12, 2008

Burj Dubai May 12th 2008 photo update

Burj Dubai May 12th 2008 photo update, the cladding is simply amazing.. The steel workers will need to hurry up or the cladding workers will soon catch them. :) In the first photo you can see a section of steel being lifted (top right) level nine of the steel work is almost complete, In a couple days the Burj Dubai will truly be in a class of its own when the 1st piece of steel is set for the 10th level.




Burj Dubai May 11th 2008 photo update

Burj Dubai May 11th 2008 photo update, more shots of Dubai and in the second photo just to the right of the Burj Dubai is the worlds largest shopping mall under construction. Oh btw just incase your wondering the cranes are now over 700 meters in height. the shortest crane has a 55m long arm. the cabin is located 10m above highest steel so its 708 meters high the tallest crane is 715 meters high.



Sunday, May 11, 2008

Render of Dubai and completed Burj Dubai

Here is a render of what the city of Dubai will look like when the Burj Dubai is completed.